JDS
HOME HELP FEEDBACK SUBSCRIPTIONS ARCHIVE SEARCH TABLE OF CONTENTS
 QUICK SEARCH:   [advanced]


     


This Article
Right arrow Full Text
Right arrow Full Text (PDF)
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Similar articles in this journal
Right arrow Similar articles in PubMed
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow reprints & permissions
Citing Articles
Right arrow Citing Articles via HighWire
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by de Vries, A.
Right arrow Articles by Conlin, B. J.
Right arrow Search for Related Content
PubMed
Right arrow PubMed Citation
Right arrow Articles by de Vries, A.
Right arrow Articles by Conlin, B. J.
J. Dairy Sci. 86:1970-1984
© American Dairy Science Association, 2003.

Design and Performance of Statistical Process Control Charts Applied to Estrous Detection Efficiency1

A. de Vries2 and B. J. Conlin

Department of Animal Science, University of Minnesota, Saint Paul 55108

Corresponding author:
A. de Vries; e-mail:
devries{at}animal.ufl.edu.

Statistical process control (SPC) charts to monitor production processes have not been widely used in dairy management. Shewhart and cumulative sum (cusum) control charts were designed to determine true changes in estrous detection efficiency (EDE) amidst normal variation in dairy cattle. A stochastic simulation model was used to track performance over time of individual cows in herds of 100 and 1000 cows. Estrous detection ratios (EDR), calculated as observed estruses divided by estimated estrous days (in periods of 1 to 60 d), were used to monitor EDE. Control charts for EDR, using normal and binomial distributions, were designed at 0.65 EDE for both herd sizes; then EDE was set to 0.65 (no change), 0.55, 0.45, or 0.35 and average days to the first detection signal (ATS) in 400 runs was determined. Observed ATS at 0.65 EDE could differ from the target ATS, depending on the SPC chart design and estimated proportions of estrous days for inseminated cows. Observed ATS were shorter for larger changes in EDE and for the 1000-cow herd. Observed ATS for a change to 0.55 EDE were ~ 300 d (100 cows) or 60 d (1000 cows) with the cusum charts. For a change to 0.35 EDE, observed ATS were ~ 50 d (100 cows) and ~ 11 d (1000 cows). Shewhart charts performed similarly or took longer to signal changes depending on period length. Observed ATS on cusum charts were much longer than minimum when non-optimal reference values were used in the design. Observed ATS were also longer when SPC charts were designed with a longer target ATS and change in EDE was small. Control charts using normal and binomial distributions generally performed similarly. Statistical process control charts detected changes in estrous detection efficiency soon enough to be potentially useful in dairy management.

Key Words: estrous detection • statistical process control • Shewhart • cumulative sum

Abbreviation key: ATS = average time to signal, cusum = cumulative sum, EDE = estrous detection efficiency, EDR = estrous detection ratio, SPC = statistical process control




This article has been cited by other articles:


Home page
J DAIRY SCIHome page
J. M. Lukas, J. K. Reneau, and J. G. Linn
Water Intake and Dry Matter Intake Changes as a Feeding Management Tool and Indicator of Health and Estrus Status in Dairy Cows
J Dairy Sci, September 1, 2008; 91(9): 3385 - 3394.
[Abstract] [Full Text] [PDF]


Home page
J DAIRY SCIHome page
A. de Vries and B. J. Conlin
Economic Value of Timely Determination of Unexpected Decreases in Detection of Estrus Using Control Charts
J Dairy Sci, November 1, 2003; 86(11): 3516 - 3526.
[Abstract] [Full Text] [PDF]




HOME HELP FEEDBACK SUBSCRIPTIONS ARCHIVE SEARCH TABLE OF CONTENTS
Copyright © 2003 by the American Dairy Science Association ®.